Events
Archives


Site Map

WATER POLLUTION CONTROL FACILITY TOUR


Headworks Building (in back) and 80 foot diameter Primary Clarifier settling tanks


Screw Pumps lift the water from the Primary clarifiers up into the aeration/ nitrification tanks. Each screw pump can move 7,600 gallons per minute.


The top of the aeration/nitrification facility. Each of the six tanks hold one half a million gallon of wastewater. Here the water is mixed with microscopic organisms and air. The organisms bring the small waste particles together into larger particles and begin to digest the waste.

Continue the tour >>

 
 
 


News
Archives

 Copyright � 2004 City of Bristol, Connecticut. All Rights Reserved.