Site Map

WATER POLLUTION CONTROL FACILITY TOUR


Three 110 foot diameter Secondary Clarifier settling tanks


The biosolid sludge removed from the bottom of the primary and secondary settling tanks are pumped into one of the facilities two 300,000 gallon storage tanks to await processing and disposal. The odorous air coming off the tanks is processed through the white chemical air scrubber.


The Operation Building is the heart of the facility, it houses the Ultraviolet Disinfection system, the Laboratory, the electrical and alarm systems control center.

<< Previous tour page



News
Archives

 Copyright � 2004 City of Bristol, Connecticut. All Rights Reserved.